No opening status is verified here. This is a model estimate; local puddles, damage and closures may differ. 254 calculated segments across 3 weather cells. Follow land-manager notices.
A current surface score does not establish a drying time. Check the rainfall observation time, refresh stale inputs and review local reports before leaving.
Upload your GPX, save it to your account and configure monitoring in the Route Cabinet. This page does not automatically subscribe you to alerts.
Open your saved routesHow the model works · Limitations · Explore routes in Whole route
Calculation: 24 Sep 2026, 11:41 UTC · 254 calculated segments across 3 weather cells. Click a segment to locate it on the map. Grey means current conditions are not confirmed. Distance order follows the source geometry for analysis; it is not an official stage itinerary.
Dry: 12.53 km · Wet: 0.0 km · Muddy: 0.0 km · High risk: 0.0 km · Unknown: 0.0 km
| Distance, km | Condition | Surface | Confidence |
|---|---|---|---|
| Dry | asphalt | High | |
| Dry | paved | High | |
| Dry | paved | High | |
| Dry | paved | High | |
| Dry | paved | High | |
| Dry | asphalt | High | |
| Dry | paved | High | |
| Dry | paved | High | |
| Dry | paved | High | |
| Dry | paved | High | |
| Dry | paved | High | |
| Dry | paved | Medium | |
| Dry | paved | Medium | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High |
1
The paved Grand Teton multi-use pathway from Moose Junction to South Jenny Lake, assessed section by section for current modeled riding conditions.
The National Park Service explicitly recommends Moose to Jenny Lake as a pathway ride. The refreshed source relation follows that named segment for 12.63 km as one connected line with ten primary ways, no alternatives, no unresolved members and no distance outside supported coverage.
The park pathway is for non-motorized use and is closed from dusk to dawn; pets are not permitted. It opens seasonally after snow and ice clear. Carry water, expect wildlife, obtain any required park pass and check current construction and closure notices before riding.
Primary planning source · Source geometry · © OpenStreetMap contributors, ODbL / Waymarked Trails