No opening status is verified here. This is a model estimate; local puddles, damage and closures may differ. 90 calculated segments across 1 weather cells. Follow land-manager notices.
A current surface score does not establish a drying time. Check the rainfall observation time, refresh stale inputs and review local reports before leaving.
Upload your GPX, save it to your account and configure monitoring in the Route Cabinet. This page does not automatically subscribe you to alerts.
Open your saved routesHow the model works · Limitations · Explore routes in Whole route
Calculation: 23 Sep 2026, 11:57 UTC · 90 calculated segments across 1 weather cells. Click a segment to locate it on the map. Grey means current conditions are not confirmed. Distance order follows the source geometry for analysis; it is not an official stage itinerary.
Dry: 4.46 km · Wet: 0.0 km · Muddy: 0.0 km · High risk: 0.0 km · Unknown: 0.0 km
| Distance, km | Condition | Surface | Confidence |
|---|---|---|---|
| Dry | ground | Medium | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | paved | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High | |
| Dry | asphalt | High |
1
The developed Gate-Belmore Trail beside Washington's Glacial Heritage Preserve, on a former railroad corridor south of Olympia. This page covers the currently mapped 2.7-mile paved section, not the county's proposed full 14.5-mile corridor.
The connected source is 4.5 km, consistent with Thurston County's 2.7-mile developed pathway. It is paved and intended for biking, walking and running. The county lists one location and says its trail map is still forthcoming, so use signed access on site.
Thurston County lists daily hours from 9:00 a.m. to dusk, a 15 mph speed limit, leashed pets and caution around debris or uneven surfaces. Do not continue onto an undeveloped future corridor; verify current county notices before travel.
Primary planning source · Source geometry · © OpenStreetMap contributors, ODbL / Waymarked Trails