Dry Mixed Muddy

Before you ride, run or hike Lesní cesta u Šímy

Is the whole route dry and open?

No opening status is verified here. This is a model estimate; local puddles, damage and closures may differ. Representative point; not verified weather coverage of every route section Follow land-manager notices.

When will this route dry?

A current surface score does not establish a drying time. Check the rainfall observation time, refresh stale inputs and review local reports before leaving.

How can I monitor my own route?

Upload your GPX, save it to your account and configure monitoring in the Route Cabinet. This page does not automatically subscribe you to alerts.

Open your saved routes

How the model works · Limitations · Explore routes in South Bohemia

Loamcast Intelligence

Current modeled condition for Lesní cesta u Šímy

Estimated trail surface condition and wetness breakdown for Lesní cesta u Šímy in South Bohemia, Czechia.

CZECHIA / South Bohemia

Current condition

Length: 1.29 km

Surface Score
/10
Current conditions unconfirmed
Current dryness cannot be confirmed: rainfall data is missing, stale or not comparable. Refresh the source or check local observations before deciding.

How to use this estimate: Loamcast combines available weather, surface, soil, terrain, and hydrology signals to identify sections worth checking before a ride, run, or hike. It is a planning aid, not a physical inspection or safety guarantee.

Check current conditions Current dryness cannot be confirmed: rainfall data is missing, stale or not comparable. Refresh the source or check local observations before deciding.
Recorded model / page update: 2026-09-11 06:20 CEST (Europe/Prague) Rainfall observation time: 2026-09-11T15:50:00Z Weather status: stale History: 7 recorded days

Inputs behind this estimate

  • Surface: gravel surface usually drains faster than dirt, but loose sections can stay damp after rain.
  • Recent rain: no measurable rain in the last 24h.
  • Terrain: no strong lowland/water-retention signal; open exposure aids drying.
  • Confidence: High — based on weather and terrain models; no recent user observations are available.

Condition Breakdown

Surface
Used as a drainage and grip modifier in the condition model.
Compacted
Road Solidity
Asphalt, concrete, or extremely hard-compacted stone base.
Solid / Paved
Moisture Sensitivity
Excellent water runoff. Structure remains firm and mud-free.
Low
Rutting & Washout Risk
Dry or paved base. Minimal risk of ruts, pooling, or washouts.
Low
Recent rain
4.8 mm in 48h, 72h unavailable.
1.3 mm / 24h
Segment spread
4 mapped segment(s) scored for this object.
9-10 / 10
Confidence
Weather source: chmi-10m.
High

Recorded 7-Day Condition History

Date Score Label Rain
2026-09-05 10/10 Dry / Fast -
2026-09-06 10/10 Dry / Fast -
2026-09-07 10/10 Dry / Fast -
2026-09-08 10/10 Dry / Fast -
2026-09-09 10/10 Dry / Fast -
2026-09-10 10/10 Dry / Fast -
2026-09-11 10/10 Dry / Fast -

Explore Loamcast

Other modeled conditions in Czechia → More routes in South Bohemia → Explore Loamcast methodology → Data sources for this estimate → Model limitations & disclaimer →